16/24 o.f Eco Junction and Termination Subframe
16/24 o.f Eco Junction and Termination Subframe
Specifics
G/T with 16 o.f Subframe— 19" – 1 unit:
– 2 SE junction modules
– 1 brackets kit for standard 19"uprights
– miscellaneous material for the installation of the input cable
– installation guide
G/T with 24 o.f Subframe— 19" – 1 unit:
– 2 SE junction modules
– 1 brackets kit for standard 19"uprights
– miscellaneous material for the installation of the input cable
– installation guide
Note: if requested, the removable transparent front cover can be supplied in painted steel of the same colour as the subframe.